The identification of the areas where there is no broadband coverage that provides the user with more than 100 Mbps of download under conditions of maximum demand in 2023 has been the result of the procedure that begins with the request and collection of the existing coverage and the three-year plans of all operators, the preliminary identification of these areas and their consolidation with the public consultation, whose objective is to obtain the definitive map of eligible areas, in which, according to the State aid regulations, it is possible to grant public aid during the year 2023 for the realization of projects of extension of the coverage of ultra-fast broadband networks. The result of the consultation, which was closed on June 22, 2023, is published in the web page of the Secretary of State for Telecommunications and Digital Infrastructures.
The links are then provided in order to download the list of eligible areas identified after the application of the aforementioned procedure, updated as of July 24, 2023. The location and contour of these areas is provided in a geographical layer file in shape format, which makes it possible to process them from any geographic information system (GIS).